|  |  |  | American Rotary Industrial Power |  |  | Maintained by: |  | American Rotary manufactures and distributes static, rotary, CNC, and digital phase converters - the largest selection of phase converters online! American Rotary also distributes transformers, load centers, safety switches, frequency drives, generators, motors, machinery, and much more. |  |
|
|
 | | Seller accepts Paypal online or Visa, MasterCard, Discover by phone (Toll Free 1-888-743-6832). Seller also accepts checks by mail, but may not ship item until funds are verified by the bank. |
|
|
|  |
|
|
GENTEC American Rotary
Phase Converters....
The largest selection of phase converters
online...
Static, Rotary, and Digital Solid-State Phase Converters |
 |
|
AMERICAN
ROTARY INSTALLATION PICTORIAL
|
|
*During
Installation: Please
refer to the complete installation pictorial by visiting our About
Me page. |
|

|
| Remove conduit box cover to expose 9 leads with 1/4" ring lugs
attached. Bolt leads 4,5,6 together if they are not already bolted.
(they may come bolted from the factory) using a 1/4 inch bolt. Insulate bundle 4,5,6. Bolt leads 1&7 to T1, 2&8 to T2, and 3&9
to T3 using a 1/4" bolt. T1, T2 & T3 must be terminated with
a 1/4 ring lug. Insulate all connections. Secure ground lug to inside of conduit box using supplied
green screw. |
|
|
| Fit insulated wire connections into conduit box.
Attach conduit
box cover. |
|
|
| Remove the backplate and secure the enclosure to suitable structure
using 1/4 inch fasteners. Drill or punch the correct hole size for
the conduit fittings you will be using. 3 holes are usually
required: one for single phase service, one for running wire to the
generator, and one to feed the load. (note: in the picture above left,
some of the holes were punched in the back of the enclosure because the
wires were run in the wall. The idler wires were run out the bottom.)
Pull the wires through the conduit and terminate with 1/4 ring
lugs. Use a ground wire for each circuit. |
|
|
| Insert backplate
into the enclosure and hang on studs protruding from the back of the
enclosure. Secure the backplate using the provided 1/4 - 28 lock nuts. |
|
 |
| When the operation of the phase converter is verified, hook up the
wires that go to the load. Align the red, yellow and green switch operators with the switch body on
the back of the cover plate with the red switch operator on the
right. Push them into the switch body until they snap into
place. (a clear cover is used here so that you can see the orientation
of the switch operators. |
|
|
| Place the cover onto the enclosure. Secure the cover using the provided screws completing the
installation. Use isolation mounts (click
here to purchase) to ensure a quiet, long
lasting generator. |
|
Please visit our About
Me page to get to the complete installation pictorial.
|
| |
*All wiring must be complete by a licensed electrician and